PRODUCTS
SS-KJ-AP42
Catalog:
Company is the professional manufacturer of Cable and wires, network and communication equipment and accessories system in Ningbo China.
Detail
![]() |
![]() |
![]() |
| 1、Pass one cable through the end cover, the long tube, and central tuber in turn,pass the other cable through the end cover.long tube in turn. | 2、Strip off 30mm of cable jacket and fold braid back over it. Cut off aluminum foil for each pair, and use a supplied copper foil shield surrounding a cable. | 3、 Fan out four twisted pairs, following the color coding label and allocate each conductor into proper slots on wiring cap. Trin the ends of conductors. |
![]() |
![]() |
![]() |
| 4、 Place wiring cap on connection module Close connection module cover, make sure the drain wire is in proper contact with grounding clip on connection module. |
5、Fasten supplied cable tie to secure grounding contact. | 6、install the cables to the modular according to the moduler instruction manual. |
![]() |
![]() |
![]() |
| 7、Asemble two long tubes by rotating the threads. |
8、Lock the two waterproof plugs on the cable. then put them into the end of the long tube. Note: The plug is engraved with the word"waterproof" on one side outward. |
9、Screw the end cover at both ends onto the long tube. Finally to check whether the waterproof plug is closely matched with the cables. |
Keywords:Patch Panel,Wiring Block
Messages








